He asked me to calculate the windows beforehand and name the deadlines
We threw off the miscalculations (including installation), 55 thousand and that the deadline is 7 days.
They came for an exact measurement, and brought out the price, 64 thousand, although the dimensions were exactly the same (I double-checked), but I did not argue, since all others have much longer deadlines
As a result, my wife went to sign the contract, and then I already read in it that the installation only took 16 days.
When I contacted the manager, she said that 7 days is the production time, and 16 is the installation time. In general, divorce, they blatantly lie about the timing of what they would order from them, although it is clear that if I ask for a miscalculation with installation, then I ask for the timing with installation. And the preliminary calculation is also said to be reduced. The windows themselves are great. There is a correspondence.