Навес в 4 ската, классика во дворе и парковки на 2 автомобиля. Конструкция полностью на болтовой сборке. Каркас окрашен полиуретановой краской, долговечная защита от коррозии и высокая стойкость колера от выгорания на солнце. Сверху металлочерепица.
I would like to express my gratitude for the work on the installation of refrigerators with an area of 270m2 on the territory of the enterprise of JSC Minbakaleyatorg (Minsk, N.Drozda str., 14). I would like to mention the professional skills and knowledge in the construction of frame structures made of sandwich panels. The company has all the necessary engineering and technical potential for the construction of turnkey refrigerators.
A good reliable company. Design calculations were made for our farm, materials were selected! The work was completed on time, the installation of the metalwork was done perfectly. Everything is clear and high-quality, well done guys! Very satisfied. We recommend it!!! Thanks! The next project is only with this organization! Masters of their craft. I recommend everyone to contact the company.
The most dishonest and unreliable contractor of all who participated in the construction of my house. We ordered from them (I worked with a man named Ivan, the contract was signed with Delo Engineer LLC) several types of metal structures and a concrete fence - always with one result: low quality, violation of all deadlines for months and endless promises that "everything will be ready next week"
The metal columns were not made according to the project (not the amount that was required according to the drawings) with poor painting quality: initially there were flaws in the painting (the contractor could not immediately eliminate them and began promising to repaint next season). The technological process was also disrupted: after a year and a half, rust appeared on all columns. The contractor promised to fix the defects for 6 months. As a result, they made several attempts, which worsened the situation. I had to look for a restorer at my own expense. The cost of restoration exceeded the original cost of the products.
The concrete base of the fence was completed more than a month late. The formwork turned out to be of poor quality for finished concrete - from the very beginning, completely different quality requirements were stipulated. Mortgages for electric cables (according to the project) were not made. It took the involvement of third-party contractors to put the fence in order, because the contractor promised to fix everything for many months.
The project of a metal and louver fence was prepared for 4 months, initially it was promised to be done in a couple of weeks. As a result, the fence was never made. The current delay is 2 months without understanding the final deadlines.